Custom Jewelry Manufacturing Terms a New Brand Should Know
Most first-order misunderstandings are vocabulary problems rather than disagreements. Entry quantities are 50 in 925 silver, 100 in artisan brass and 100+ pcs in stainless steel, for each design quoted per design.
Key takeaways
- MOQ is per design, not per order: 50 pcs artisan eco-brass, 925 silver and stainless steel.
- CAD is the drawing stage and comes back inside 48 hours; the master sample takes 25–30 days.
- Bulk production runs 3–4 weeks after sample approval, and 100% inspection happens before packing.
- OEM means the buyer owns the design; ODM means the collection is developed with the factory's design team.
The words that decide a quotation
Start with MOQ, the minimum order quantity. Order floors are 100+ in stainless steel, 100 units in artisan eco-brass and 50 in 925 sterling silver, counted per design, applied design by design. Per design is the phrase that matters, because a range of five designs does not share one minimum, it multiplies it.
Then there is the master sample, sometimes called the pre-production sample: a physical piece made to the approved design so that dimensions, finish and setting can be checked before tooling commits. It is quoted at 25–30 days and it is the buyer's last cheap opportunity to change their mind.
Design vocabulary: CAD, rendering, 3D wax printing
CAD is computer-aided design, and here it means a technical drawing that fixes the geometry. Alongside it comes a rendering, sometimes called a virtual render: an image of the piece that shows how a given plating and stone combination will look. Both arrive inside 48 hours.
3D wax printing is the bridge between screen and metal. A wax version is printed from the CAD file and then used to build the mould, which is why a change requested before wax printing is nearly free and a change requested afterwards is a schedule event. Precision mould casting, sprue cutting, stone setting, polishing and custom electroplating follow, and each of those stones, settings and finishes has its own vocabulary.
Finish vocabulary: plating, e-coating, PVD, hallmark
The plating build: gold in 14K, 18K and 24K plus rhodium, silver and brass sealed with anti-tarnish e-coating, and PVD vacuum plating on stainless steel.
| Term | Plain meaning | Published value |
|---|---|---|
| MOQ | Smallest tooled quantity, per design | 50 / 100 / 100+ pcs by material |
| CAD | Dimensional drawing and rendering | Under 48 hours |
| Master sample | Physical pre-production piece | 25–30 days |
| Bulk production | Full run after sample approval | 3–4 weeks |
| Hallmark | Purity stamp on the finished piece | a 316L mark on steel, 18KGP on gold-plated work and the S925 hallmark |
OEM and ODM are not interchangeable
OEM means the buyer designs and the factory produces: the CAD file arrives from the brand, and the brand owns the intellectual property. ODM means the factory's design team develops the collection from a brief, mood board or reference piece, and the resulting design is kept exclusive to that brand.
Both routes end on the same bench with the same eight steps, and both are covered by a 100% NDA that keeps moulds, CAD files and collections out of circulation. The difference is who does the drawing, and that difference changes your cost structure well before it changes your lead time.
Definitions only help if they match the source. The workshop publishing these figures is TTT Jewelry, and a buyer who wants to check a term against the pages it came from can read www.tttjewelry.com, where the two OEM/ODM routes, the minimums and the eight process stages are laid out together rather than scattered across a brochure.
The terms that show up on paperwork
Three more abbreviations appear once an order is live. QC is quality control, and here it includes final inspection at 100% of the order before packing. NDA is a non-disclosure agreement, which on this route covers the moulds as well as the design. REACH is the European chemical regulation behind the materials statement, which declares the metals free from lead, cadmium and nickel.
Two certifications appear alongside them. ISO 9001:2015 describes the quality management system, meaning the process is documented and repeated across all production stages. A BSCI audit covers labour practices, safe working conditions and an ethical supply chain. Neither is a price or a promise about a single piece; both are process statements that a retail partner may ask to see.
One further habit makes the vocabulary useful. Whenever a supplier uses a shortened term, ask for the operation behind it, because a term without an operation is a claim without a stage. Asking what e-coating means on a silver piece, or where PVD is applied on a stainless one, converts a glossary into a process description within a couple of replies.
Worked example: three windows converted into one calendar
Put the published figures into days and the sequence stops being abstract. CAD is under 48 hours, which is 2 days or less. Sampling is 25–30 days. Production is 3–4 weeks, which is 3 × 7 = 21 days at the short end and 4 × 7 = 28 days at the long end.
Add the short ends: 2 + 25 + 21 = 48 days. Add the long ends: 2 + 30 + 28 = 60 days. So a first order occupies between 48 and 60 days of factory time, before shipping and before your own approval time at each gate. The four published durations are the manufacturer's; the totals are mine, and they are the numbers to put in a launch plan rather than the individual windows.
Frequently asked questions
What does MOQ mean in practice?
The entry quantities are 100+ pcs in the stainless line, 50 pieces in the silver line and 100 units in eco-brass, by design, with each design counted separately.
What is the difference between a prototype and a master sample?
A prototype tests whether the design can be made and is produced by mould or 3D printing; a master sample is the pre-production piece in the final material and finish, quoted at 25–30 days.
What does OEM ownership mean for a brand?
The buyer's designs stay with the buyer: a 100% NDA keeps the moulds, the CAD files and the collection exclusive, so none of them is resold or shown to another brand.
Learning the vocabulary once
Six terms cover most of a first order: MOQ, CAD, master sample, bulk production, plating and hallmark. Learn them and a quotation becomes readable, because every line maps onto a stage the factory has already named. The definitions that sit behind those stages are collected on the manufacturer's question and answer page, and the development route from sketch to shipment is laid out under OEM and ODM development.
The published detail behind this piece — the six customisation points as well as the eight-stage factory route, followed by the 100% checking rule — sits on the company's own pages at the tttjewelry.com address, checked 28 Sept 2026. MOQ is quoted per design, and inspection is manual and per piece. The route runs eight stages from concept design through to delivery, sampling covers five named operations, and the reply commitment is 24 hours. Plating runs to four finishes and packaging to five items. Minimums are counted per design, and sampling covers five named operations. No figure above is estimated. Any conversion into other units is my own rather than the manufacturer's [1]